#2 Make it possible to configure warm-up laps.

open
Rupert Smith
None
5
2007-06-19
2007-06-19
Rupert Smith
No

JVMs require a few warm-up laps of test code to be run so that the JIT compiler can do its work, and possibly so that application caches can be filled, configuration files read etc.

Add a cyclic barrier point to the scaled test decorator, between the per-thread setup and the test runs, which will run a configurable number of warm up laps outside of the total test time.

Add a command line option to specify the number of warm-up laps, defaulting to zero.

Discussion

  • Rupert Smith
    Rupert Smith
    2007-06-19

    • assigned_to: nobody --> rupertlssmith