Hello,
currently the roadmap feature shows a percentage completion at the
bottom of the page, over all versions. E.g. I have 5 issues slated for
completion in 3 versions. 2 are done. The number at the bottom shows 40%
completion. This number should be calculated per version in addition to
overall. The overall number is not as useful as a number per version
(after all I want to see which version is how far).
Should I add this to the bug tracker?
Thanks
Jan
--
Geschäftsführer
Hitflip Media Trading GmbH
http://www.hitflip.de - jetzt neu: http://www.hitflip.at
Tel. 0221-272407-27
Fax. 0221-272407-22
|